Skip to main content
Case Studies

Case study: F to C on a Wolverhampton terrace

3 min read
Case study: F to C on a Wolverhampton terrace

How a two-bedroom mid-terrace moved three bands after a targeted, low-cost improvement programme.

What this means for landlords

Commentary by Jujhar Property Services

The property failed at band F on an old back boiler, 100mm of loft insulation and halogen lighting throughout. The landlord replaced the boiler with a condensing combi and full controls, topped the loft to 300mm and swapped every fitting to LED. No external works, no disruption to the tenancy beyond the boiler week. The reassessment came back at band C. The lesson is that heating system and controls dominate the score in small terraces — spend there first.

Need an EPC on this property?

Book online in under two minutes, or ask for a quote first. England only, free travel within 15 miles of Wolverhampton.

All news & insights